Well, the basic clearing has been done. Next step is to burn the trash, then grade and get ready for the gravel. The burn permit will probably be issued next week. Just hoping it all gets done before the end of the month or we'll be here into December...brrrrr. LOL!
Stu backed our Freightliner, Freddie, down to where he plans to back the RV...note him between the two tall trees...the front door and awning will open out to the left where the spot is wider. Looking good!
The clearing was also finished on the second drive, that will eventually connect into the main one for the RV lot, and the clearing for the eventual pole barn.
Stu spent most of the day cutting up firewood and trimming trees overhanging the main driveway. He had to take the air hose on Freddie to the back of the truck when he was done (and to himself before he could go to lunch...LOL). He also saved one large tree to be used in our future house.
Not much will happen now till after the trash is burned...then we'll be back posting!
Still rolling,
Stu and Donna
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment
Love to hear from you - drop a few words and we'll reply!
Note: Only a member of this blog may post a comment.