Things moving along....slowly, but moving.

Monday, May 16, 2011

Stu met with the electric company engineer and found out what was needed to get power to our RV site as well as the restrictions on putting water in the same ditch. The next step was meeting with our contractor to get an estimate on that work. We are currently waiting for him to get with an electrician and get back to us with a quote.

Since it looks like it will be a couple more weeks before we can move to the property, we extended another month here at Maple Hill RV Campground.

The driveway looks good, still a little soft on one side but time will take care of that and it's not on the side where the RV will be parked.

Here is our cost tracking thus far:


Still rolling,
Stu and Donna